BR GW - cast in letters
BR GW - B49 at Springwell
BR DB - wheels left
BR GW - latest view
BR DB - demolition in progress
BR DB - work starts
BR DB - old brake rigging
1001 - Bowes before....
O&S - warning
BR - gen - Planet
BR - gen - Westoe
BR - gen - AB plate
BR - gen - WST
BR GW - visiting Beamish
BR gen - pair
BR DB - Ruston shunting waggons.
BR GW - at Beamish
BR DB - at RailFest 2012
1001 things - Bowes Railway "ordinary"
BRG - Bowes 511
BRG - Bowes 971
BRG - No 22 on PM CURVE
BR 971 - getting there Jan 2018
BR971 - bits to shotblast 1
BR971 - bits to shotblast 2
BR971 - bits to shotblast 3
BR971 - bits to shotblast 4
BR971 - primed ironwork
BR971 - body demolished
BR971 - chassis part built
BR971 - fans fitted
BR971 - fans ready to fit
BR971 - brake spacers
BR971 - finished trap door
BR971 - drawhook and other parts
BR971 - hopper one end slope
BR971 - main spring
BR971 - lettering done
BR971 - one mainspring amongst other things
BR971 - mixed glossed ironwork
BR971 - planks painted
BR971 - trap door catches
BR971 - underframe 1
BR971 - retaining loops
BR971 - spring pads and so on
BR971 - underframe 4
BR971 - underframe 6
BR971 - underframe 3
BR971 - underframe 5
BR971 - underframe 7
BR971 - wheelset and axleboxes primed
BR971 - unloading wheelsets
BR971 - wheels for cleaning
BR971 - underframe 2
BR971 - arrival
BR971 - corner plate & angled grab rail
BR971 - butressed end
BR971 - corner plate with vertical grab rail
BR971 - end bolster buttress
BR971 - other end of the hopper
BR971 - fire damage sides
BR971 - hopper end
BR971 - hopper frame
BR DB - deconstruction
BR DB - belt it
BR DB - shelter dry fit
BR DB - misc iron in primer
BR DB - arriving at Haltwhistle
BR GW - Under the heapstead April 2011
BR DB - yepp!
BR GW - leaving 3
BR DB - oil seal
BR DB - last off
BR DB - Next move?
BR DB - PGB and HeadStock
BR DB - shelter trial
BR DB - recycled sleeper
BR DB - trial assembly
BR DB - painting starts
BR DB - hole in oak
BR DB - hit it!
BR DB - wheels in
BR DB - more body building
BR DB - painting in progress
BR DB - wheel 1
BR DB - wheels away
BR DB - axle box primer
BR DB - touchdown 1
BR DB - W-iron in gloss
BR DB - awaiting collection
BR DB - deck planks
BR DB - wheel 2
BR DB - dong!
BR DB - touch down 2
BR DB - loading up
BR DB - shelter finished
BR DB - awaiting collection 2
BR DB - arrived back
BR DB - start here
BR DB - early body build
BR DB - first move
BR DB - new letters
BR DB - sign writing
BR DB - joints sealed
BR DB - brakes renewed
BR DB - old letters
BR GW - B49 end 02
BR GW - B49 end03
BR GW - B-49 at Haltwhistle.
BR GW - B-49 and No 25
BR GW - B49 end 01
BR GW - first part off
BR GW - drop side removed.
BR GW - drop sides 01
BR GW - remains 2
BR GW - remains 1
BR GW - nut kebabs
BR GW - more deconstruction
BR GW - PGB demolishing
BR GW - wheels to go
BR GW - last metal bit
BR GW - any old iron
BM BV - rub down
CF - BR - Erecting shop 2
BR GW - burnt
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
322 visits
BR GW - painting in progress
Part of the considerable number of metal parts going through the painting stages, currently grey undercoat is being applied over the anti-rust primer applied at the shot-blasters, and will be followed by black gloss top coats.
Translate into English
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.