StoneRoad2013

StoneRoad2013

Posted on 04/04/2011


Photo taken on June  3, 2009


See also...


Keywords

Stanegate Restorations
Bowes Railway
Drift Bogie
B-1
Kibblesworth Drift Bogie
Kibblesworth


Authorizations, license

Visible by: Everyone
All rights reserved

170 visits

BR DB - trial assembly

BR DB - trial assembly
First trial assembly of the four outer parts of green oak underframes for the Drift Bogie is underway. The two cranes are both 1 ton capacity, and at times more of them would have come in very handy....

Comments