Liaoning hills
Double departure
Lounge
Pingzhuang
Kings Cross- Grand Central
On Hengshan bank
Burma Mines
Huangjia departure
Colliery passenger service
Cheddleton Yard
Indian Pacific
Pingzhuang coal
Bukinje reflections
Above Novat
Diaobingshan
Ammonoosuc
No.5 Mine
Consall Arrival
Rhyl Voyager
Colliery branch line
Dust storm
Apesford Bank
Passing
Narrow gauge fun
Chinese Steam
Diaobingshan departure
Sliding Bridge
End of the line
Fuxin as was
Sunset and steam
Didao shunt
Afternoon prep
Steelworks
Dazhuangkuang colliery
Narrow gauge at Klenovic
Norchard
Qiupigou
On the footplate
Approaching Apesford
Alongside the Churnet
Shunting in the snow
Consall crossing
Servicing point
Passing the gallery
SY at Xifeng
Coal picking
Snowploughs
4277 on the climb
Loading
On the bank
Railway tower
New kid on the block
Uphill to the Burma Mines
Bristol bound
Amgoorie Tea
Didao
Bridges old and new
Haulage
Petrol tanks
Mine No.3
B1 freight
London Northwestern
Mytholmes viaduct
Leaving Daban
Making rainbows
Track gang at rest
Leaving Dalu
New Street
Bi Shui
Yamenmiao
A wet start
4a
Pumping station
Freight on the move
Alpha
Branch line
Threlkeld
Almost there
Steaming at Threlkeld
Damems loop
Minninglow embankments
Biomass and semaphores
More empties for the pit
Rail Freight 2017
Banking the empties
On Oakworth bank
At Oxenhope
B1 and box
Oakworth glint
Mytholmes
Meihekou sunset
Buxton bound
Gulumanhan
Heading for the colliery
Shift change
Banked
Eagle Mouth Rock
Coal Power
Crossing the dry riverbed
Not possible today
Harrogate No.1
First train of the day
After the arrival
Long distance travellers
Icy at the colliery
Waiting at Froghall
Winter on the Churnet Valley
Nancha memories
Winter at Tiefa
Searchlight
Englands in the trees
Spoil train
Sandy Lane WD
Euston arrivals
Diaobingshan winter
Storming past Biligou
The new bridge arrives
Mineral at Chasewater
Dowlow loading bunkers
Fixing the hole
Crossing the viaduct
Industrial railways at Hope
Increasing capacity
Crossing in the works
Carbon rain
Location
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
346 visits
Bridge building
A case of being in the right place at the right time. SYs 1369 and 1095 had brought the 160 tonne capacity Qiqihar based rail crane up the Hengshan bank with the final concrete beam for a new bridge close to the colliery at Zhangzin. The train is being split to take off the match wagon/crew accommodation before the crane is shunted up the slope to the bridge.
SV1XV, Don Barrett (aka DBs travels), Loose_Grip/Pete and 2 other people have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.