1986 (PO - NFD) Mineral Wagon

1986 - NCMM waggon


Folder: NCMM waggons
The first set of images are from the inspection at Wakefield in late November 2021. Arrived in Haltwhistle 1st February 2022 for major attention. The first job will be to dismantle & record ... mainly so that green Oak baulks can be obtained to build the underframe.
  • 1986 (PO - NFD) Mineral Wagon
  • 1986 - Inspection [1 of 16]
  • 1986 - Inspection [2 of 16]
  • 1986 - Inspection [3 of 16]
  • 1986 - Inspection [4 of 16]
  • 1986 - Inspection [5 of 16]
  • 1986 - Inspection [6 of 16]
  • 1986 - Inspection [7 of 16]
  • 1986 - Inspection [8 of 16]
  • 1986 - Inspection [9 of 16]
  • 1986 - Inspection [10 of 16]
  • 1986 - Inspection [11 of 16]
  • 1986 - Inspection [12 of 16]
  • 1986 - Inspection [13 of 16]
  • 1986 - Inspection [14 of 16]
  • 1986 - Inspection [15 of 16]
  • 1986 - Inspection [16 of 16]
  • NCMM - unload 2 of 8
  • NCMM - unload 3 of 8
  • NCMM - unload 4 of 8
  • NCMM - unload 5 of 8
  • NCMM - unload 6 of 8
  • NCMM - unload 7 of 8
  • NCMM - unload 8 of 8
  • 1986 - has now arrived
  • 1822 - backing up to unload
  • 1822/1986 - solebars plus one
  • 1822/1986 - these are the six main pieces
  • 1822/1986 - making tennons
  • 1822/1986 - finished tennons
  • 1822/1986 - beginning mortices
  • 1822/1986 - finished mortices
  • 1822/1986 - cutting to length
  • 1822/1986 - a bit of training
  • 1822/1986 - fans / spring supports
  • 1822/1986 - angled tennon detail
  • 1822/1986 - from above
  • 1822/1986 - almost ...
  • 1822/1986 - headstock butterflies
  • 1822/1986 - butterfly detail
  • 1822/1986 - headstock with butterflies fitted
  • 1986 - centre spine built
  • 1822/1986 - underframe dry build
  • 1986 - solebars & headstocks
  • 1986 - headstock
  • 1986 - underframe
  • 1986 - dismantling
  • 1986 - main side brackets
  • NCMM - not much left !
  • NCMM - headstock straps
  • 1986 - drawbar spring
  • 1986 - buffers
  • 1986 - corner plates
  • 1986 - floor plank fitting.
  • 1986 - floor planks
  • NCMM - both underframes
  • 1822 - underframe kit
  • 1986 - floor planks, primed
  • 1986 - full dry fit & painted with primer
  • 1986 - the headstock strap
  • 1822/1986 - wheels
  • 1986 - casting marks [1 of 10]
  • 1986 - casting marks [2 of 10]
  • 1986 - casting marks [4 of 10]
  • 1986 - casting marks [5 of 10]
  • 1986 - casting marks [6 of 10]
  • 1986 - casting marks [7 of 10]
  • 1986 - casting marks [8 of 10]
  • 1986 - casting marks [9 of 10]
  • 1986 - casting marks [10 of 10]
  • 1986 - wheel bearing
  • 1986 - body building
  • 1986 - back corner
  • 1986 - painting in progress
  • 1986 - rubbing down
  • 1986 - signwritten
  • 1986 - Signwriting details [1 of 4]
  • 1986 - Signwriting details [2 of 4]
  • 1986 - Signwriting details [3 of 4]
  • NCMM[f&l] - 1986 finished
  • 1986 and 1822 fully done