Missouri Public Service - Independence, MO
Missouri Public Service - Independence, MO
Missouri Public Service - Independence, MO
Almeida
Kyiv. Maidan Nezalezhnosti (Independence Square).…
Grand Independence Ball, Oaksville, New York, July…
IMG 0252
IMG 0251
IMG 0250
IMG 0249
IMG 0248
IMG 0247
IMG 0246
IMG 0243
IMG 0242
IMG 0239
IMG 0238
IMG 0236
IMG 0235
IMG 0234
IMG 0233
IMG 0232
IMG 0231
IMG 0224
IMG 0223
IMG 0222
IMG 0221
IMG 0220
IMG 0219
IMG 0218
IMG 0217
IMG 0216
IMG 0215
IMG 0214
IMG 0213
IMG 0211
IMG 0210
1/200 • f/20.0 • 18.0 mm • ISO 800 •
Canon EOS Rebel T6
EF-S18-55mm f/3.5-5.6 IS II
EXIF - See more detailsLocation
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
313 visits
Missouri Public Service - Independence, MO
I’m not entirely sure if this substation has been decommissioned completely. This Sub use to run 34.5kv to (I’m assuming 4kv or 4160v.) years ago. I think it now runs 13kv or 12kv to 4kv now, I could be very well wrong. I was standing by the fence and I heard the Transformers still making a buzzing noise, so I’m a little bit confused now.
This is one of very few 34.5kv “Pocket Subs” left on MoPub’s grid. I need to do a Line Safari in this area soon before KCP&L or IP&L decide to take down the rest of the 4kv System in this area.
This is one of very few 34.5kv “Pocket Subs” left on MoPub’s grid. I need to do a Line Safari in this area soon before KCP&L or IP&L decide to take down the rest of the 4kv System in this area.
Power Lines, Jesse Lor, have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
I've seen Alabama Power run old 46/4.16 kV subs off of the 12.47 kV grid by installing a 46/12.47 kV transformer and running it backwards as a step-up to power all the old equipment. Ultimately, the sub would run as a 12.47/46/4.16 kV setup, with no incoming or outgoing 46 kV lines.
Here's an example in Mobile, AL I photographed a few years ago:
www.ipernity.com/doc/connecticut_power_lines/33395355