TRv6 - painted planks {floor}
TRv6 - painted planks {sides}
TRv6 - body build
TRv6 - door work
TRv6 - body build progress {1 of 2}
TRv6 - body build progress {2 of 2}
TRv6 - laying off
TRv6 [f&l] - north side {1 of 12}
TRv6 [f&l] - west roof {9 of 12}
TRv6 [f&l] - rain strip {12 of 12}
TRv6 [f&l] - west end {6 of 12}
TRv6 [f&l] - south east {7 of 12}
TRv6 [f&l] - drawgear {4 of 12}
TRv6 [f&l] - underneath {5 of 12}
TRv6 [f&l] - south west {8 of 12}
TRv6 [f&l] - east end {3 of 12}
TRv6 [f&l] - north east corner {2 of 12}
TRv6 [f&l] - roof {10 of 12}
TRv6 [f&l] - corner detail {11 of 12}
TRv6 - final interior {1 of 8}
TRv6 - final interior {2 of 8}
TRv6 - final interior {8 of 8}
TRv6 - final interior {3 of 8}
TRv6 - final interior {6 of 8}
TRv6 - final interior {4 of 8}
TRv6 - final interior {5 of 8}
TRv6 - loading {2 of 6}
TRv6 - loading {3 of 6}
TRv6 - loading {5 of 6}
TRv6 - loading {1 of 6}
TRv6 - loading {6 of 6}
TRv6 - loading {4 of 6}
TRv6 - unloading {2 of 2}
TRv6 - cant rails
TRv6 - plank blanks
TRv6 - corner posts
TRv6 - Top arch repaired
TRv6 - bodywork components
TRv6 - repair detail
TRvan6 - Oak frames progressing
TR - two underframes
TRv6 - fitting more brackets
TRv6 - chassis from east end
TRv6 - spacers
TRv6 - headstock end
TRv6 - rolling chassis
TRv6 - painted chassis
TRv6 - painted roof sticks
TRv6 - repaired roof-sticks
TRv6 - chassis progress
dol - Dolgoch viaduct [n of m]
66045 - preparing to unload
TRv6 - painting progress
66045 - on the ground
66045 - Delivery rig
66045 - arrival at Stanegate Restorations
TRv6 - loaded up !
TRv6 - parts laid out
TRv6 - tucked into the corner
TRv6 - nearly there
TRv6 - final dry fit
66045 - LMS waggon at Wharf
TRv6 - Meranti [6 of 6]
TRv6 - Meranti [5 of 6]
TRv6 - Meranti [4 of 6]
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
20 visits
TRv6 - painted planks {roof}
Various planks being painted {1 of 3}
The red is the outside face for the body planks, the cream is the inside face of the roof planks [most of which are original] and the black is the underside of the floor. [normally the underside of floor planks are not painted, but modern plantation timber needs the additional protection]
In the background, the van's body structural framework is now in undercoat.
The red is the outside face for the body planks, the cream is the inside face of the roof planks [most of which are original] and the black is the underside of the floor. [normally the underside of floor planks are not painted, but modern plantation timber needs the additional protection]
In the background, the van's body structural framework is now in undercoat.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.