RERM - bs - repaired old end arch
RERM - bs - window beads
RERM - bs - glossed interior
RERM - starting again
RERM - bs - right a bit
RERM - bs - roof
RERM - bs - who left that there
RERM - bs - fitting the floor
RERM - progress supervisor
RERM - painting gutter
RERM - bs - outer finish, 1
RERM - bs - outside finish, 2
RERM - bs - outside finish, 3
RERM - almost ready
RERM - new sign
RERM - opening day TSnPA
RERM - finished
RERM - River Irt at dalegarth
RERM - official opening plaque
RERM - profile
RERM - mary fair
ddd - very slow speed accident
RERM - bs - roof stick ends
RERM - bs - oversize repair
RERM - bs - six roof sticks before
RERM - bs - original panel cleaned
RERM - bs - distorted
RERM - bs - repairs in progress
RERM - platform view
RERM - unveiling
RERM - ribbon cut
RERM - offical opening speech
RERM - introductions
RERM - discussions
RERM - bs - legless
RERM - bs - delivery time
RERM - bs - power supply
RERM - bs - legs to fit
RERM - bs - the final result
RERM - bs - groove clean
RERM - bs - floor and some side sections
RERM - bs - grab rails
RERM - bs - first fix seats
RERM - bs - outside finish, 4
RERM - bs - end in place
RERM - bs - inside finish, 6
RERM - bs - inside finish, 5
RERM - bs - inside finish, 8
RERM - bs - inside finish, 7
RERM - bs - cills and floor
RERM - bs - gloss topcoat
RERM - bs - air vent
RERM - bs - structural dry build 2
RERM - bs - structural dry build 3
RERM - bs - structural dry build 1
RERM - bs - roof dry fit
RERM - bs - planking progress
RERM - bs - old door repairs
RERM - bs - old door panels
RERM - bs - new to old
RERM - bs - new floor
RERM - bs - new door planked
RERM - bs - holes repaired
RERM - bs - joint in undercoat
RERM - bs - new door frame
RERM - bs - glossed roof
RERM - bs - exterior view of planking
RERM - bs - exterior gloss
RERM - bs - interior planks
RERM - bs - colour matching
RERM - bs - chamfer details
RERM - bs - adding in the old
RERM - bs - van loaded
SR RERM
RERM - The Green
RERM - bs - largest piece
RERM - bs - for sale
RERM - bs - worst side panel
RERM - bs - roof remains
RERM - bs - various large sections
RERM - bs - another project arrives at Haltwhistle
RER - Boot station
RERM - sign
RER - TiG - Train from Spain
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
180 visits
RERM - bs - under repair
The six original roof sticks - and a short length of detached cant rail - under repair. This includes work on the cant rail "dovetails" and repairs to a small number of other areas.
In order to retain the largest amount of original material, the remains of severely rusted nails that had been used to fasten down the roof planks will be removed using a plug cutter and a tight-fitting section of dowel will be glued in as a replacement and then cut back to match the original surface. This process has just been started and will take some time to complete.
The new roof will need somewhere for the new fixings to be attached.
In order to retain the largest amount of original material, the remains of severely rusted nails that had been used to fasten down the roof planks will be removed using a plug cutter and a tight-fitting section of dowel will be glued in as a replacement and then cut back to match the original surface. This process has just been started and will take some time to complete.
The new roof will need somewhere for the new fixings to be attached.
Erhard Bernstein has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.