Resavica Colliery
Senjski Rudnik
Shaft kilns at work
Viscose
Main line survivor
Repairs
No.9
Empty
Buckets
Excavator
The orange washery
Main line in industry
Back to the depot
Kostolac power station
Preparing for work
Water and grain
Steam leak
Narrow gauge at Klenovic
Silos
Opencasting
Kostolac
Night time at the washery
Loznica Viscose
Shunting the washery
Kostolac
Cacak
The traverser
Brown Coal
Vreoci electrics
Vreoci dragline
Kostolac
Vreoci steam farewell
Loading bunkers
Limekilns
Resavica steam power
Resavica
Shunting the Vreoci washery
Morning orders
Cirikovac Mine loader
Walkway
Klenovic opencast mine
Steaming washery
Laid off
Vreoci washery
Kostolac A power station
Kostolac A
Senje Mine headgear
Vreoci washery
Vreoci opencast
The Three Sisters
View from the bus
Dirt tip haulage
Loznica
Resavica Coal Mine
Resavica Colliery
On the crossing
Vreoci opencast
Senje Mine
Evening at Kostolac shed
Vreoci
Ropeway
Mixed Gauge
126-014 shunting Resavica
126-014 at Resavica Colliery
Washery
Kostolac tower
Zrenjanin water tower
Viscose Factory
Location
See also...
Mining, mining facilities, equipment, mine tailings and other relics in underground mining as well as in- **Bergbau, bergbauliche Anlagen, Ausrüstungen und Abraumhalden bzw. andere Hinterlassenschaften im Untertagbau wie auch im Tagebau
Mining, mining facilities, equipment, mine tailings and other relics in underground mining as well as in- **Bergbau, bergbauliche Anlagen, Ausrüstungen und Abraumhalden bzw. andere Hinterlassenschaften im Untertagbau wie auch im Tagebau
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
79 visits
Coal loading
At the loading point for the 900 mm gauge electric railway connecting the Vreoci opencast coal mines to a large washery. There were 17 locomotives in service with the oldest dating back to 1942. The maximum speed of all electric locomotives is 30 km/h. The trains consist of 17 self-discharging wagons and the weight of a loaded train is 800 tons of which 500 tons are coal. Locomotive No.4 was built in Belgium by Haine St. Pierre/BBC in 1952.
The Vreoci coal mines belong to the state-owned Kolubara group which was established in the mid-1950s. There are four open cast mines: B, D, Tannav and Istokzabad. They have two power plants. The Verikicrljeni power plant is connected to the mines by an electric 900 mm gauge line, whilst the power plant in Obremovac is connected by an electrified standard gauge line. The total output of all mines is about 25 million tons of coal per year. Of this amount, 21.5 million tons is for the two power plants, and the rest is for sale to other consumers.
The Vreoci coal mines belong to the state-owned Kolubara group which was established in the mid-1950s. There are four open cast mines: B, D, Tannav and Istokzabad. They have two power plants. The Verikicrljeni power plant is connected to the mines by an electric 900 mm gauge line, whilst the power plant in Obremovac is connected by an electrified standard gauge line. The total output of all mines is about 25 million tons of coal per year. Of this amount, 21.5 million tons is for the two power plants, and the rest is for sale to other consumers.
Loose_Grip/Pete, Steve Bucknell, SV1XV have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.