0 favorites     0 comments    555 visits

See also...


Keywords

train
rail
railway
SDJR
Somerset & Dorset Joint Railway
general arrangement drawing


Authorizations, license

Visible by: Everyone
All rights reserved

555 visits


S&DJR 4-wheeled workmen's coach drwg PJS 22 5 1972

S&DJR 4-wheeled workmen's coach drwg PJS 22 5 1972
As with the other drawings the small squares are 1/10 of an inch - for 4mm/1ft. These general arrangement drawings have been made from photographs, sometimes with the aid of an overall length. So do not consider them as scale drawings.
27.10.2012 I am amazed that a series of drawings, that I made from photos back in the early 70s, has created the amount of interest that they have. Mind you I am still not sure what made a ready-to-run manufacturer like Bachman produce a 7F 2-8-0 with limited range of operation. They didn't even run over the whole of the S&D - apart from occasional visits to Highbridge works (edit - I am not at all sure that the class did come up the Burnham line at all). S&D magic!

Comments

Sign-in to write a comment.