NER70 - paintlayers
NER70 - conserved writing 1
NER70 - roof plank
NER70 - not a good plank
NER70 - roof boards done
NER70 - Dry fit of new side.
NER70 - replaced timber
NER70 - old floor
NER70 - delivery 1
NER70 - last layer
NER70 - starting floor
NER70 - other side repairs
NER70 - new side and floor
NER70 - new lower floor
NER70 - new top floor
NER70 - adding plank
NER70 - refaced
NER70 - first small end
NER70 - top small end
NER70 - floor planks
NER 70 - insulation
NER70 - three doors
NER 70 - looking in
NER70 - sealer in place
NER70 - floor 2
NER70 - floor 1
NER70 - roof stick joint
NER70 - brass ring
NER70 - old bolts 1
NER70 - writing 4
NER70 - writing 3
NER70 - writing 2
NER70 - oilcloth
NER70 - bung etc
NER70 - writing 1
NER70 - inside the roof
NER70 - hole in the roof
NER70 - delivery 4
NER70 - delivery 3
NER70 - delivery 2
NER70 - built 1870
NER 70 - NER arms
NRMv - NER70 - Single Driver
NRMv - NER70 - loco No.1
NER70 - TiG - spinner
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
579 visits
NER70 - sealing fabric
A small sample was removed for photograhic and identification purposes.
(taking suitable precautions, as the white substance is likely to be white lead putty)
Translate into English
(taking suitable precautions, as the white substance is likely to be white lead putty)
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
X
Sign-in to write a comment.