NER70 - other side repairs
MF - caulking knots
MF - reflections
NER70 - new lower floor
NER70 - new side and floor
NER70 - new top floor
NER70 - adding plank
NER70 - refaced
MF - cotton on
MF - caulking to go
MF - caulking gone
TiG (air) / 1001 - Avro Anson 1
1001 - Avro Anson 2
1001 - Avro Anson 3
BT - Fowler B5 at Shildon (VVM)
mods - PGB - two chairs
MSP - rocking chair plus
SWP - sunny chair
NER70 - first small end
NER70 - top small end
BM CV - Bonnie in her best kit
BM CV - back in Spennymoor
BM CV - van and Bonnie
O&S - getting knotted
BC - start here
BM BV - at Pockerley
BC - remains display
1001 - NER Birdcage Brake
underframe 110
underframe 109
underframe 108
underframe 107
underframe 102
underframe 106
underframe 103
underframe 105
underframe 101
underframe 104
underframe 111
mods - PGB - chair model
mods - PGB - model chair
BM CV - horse drawn move
A&P - similar at show
A&P - old canopy
A&P - steam trials
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
697 visits
NER70 - starting floor
Peter and Jonathon start the task of replacing the first layer of the floor boards.
The original floor was double diagonal planking with a thin central layer of horsehair insulation.
The original floor was double diagonal planking with a thin central layer of horsehair insulation.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.