Preparation
Semaphores at Gulumanhan
Deflectorless
Ash pit
Station crossing
Back to work
Hailar shunt
Back to Huanan
Desert line
Running through Gulumanhan
New line
Coal stocks
Sanbao loader
Workers' train
New Mine
Yuzhou
Limekiln country
River Crossing
Brickmakers
Headlight in the dusk
Shift change
Farewell Sandaoling steam
On the burning tip
A lucky moment
Sheep and industry
Ice cold steam
Miners' train
River bridge
Nanpiao limekiln
Spoil
Loco water
End of the climb
The old and the new
Early morning at Sanjiazi
Baby furnaces
QJ 7204
Local service
Skoda at the big pit
Furnaces
Fushun industry
Last days at Yaojie
A corner of the big pit
Shunting the washery
Passenger service
Sunrise empties
Coal from the deep mines
Run around
Majiawan
Walking the walls
Fengshuigou
Over the top
Overburden
On the curve
Local duties
Ready for coaling
Pushing back
In the washery
Triple-headed
Washery approach
A rusty one
Full deflectors
The old Jitong line
North from Suihua
Heading west
Colliery steam on the main line
Nanzhan yard
The Chinese Way
Narrow gauge in the woods
Climbing Hengshan bank
Out of season
The old and the new
Coal to go
Huan He crossing
Steam and greens
Hoffmann
Railway building
Power station
Tourist train
Semi-roundhouse
Ouch!
Going back to work
Upcast
QJ on the bridge
Brick and lime
Snow festival
Colliery crossing
Street running
Arriving at Caiziba
Cable car base
Lijing Mine
Off to work
Dongchang crossing
The red washery
Heavy freight
Third Mine
Home from the tip
Hoffmann
At the tippler house
No empties
Under the wires
Sand
3
Back to the quarry
Copper mine
The shed
Daban exchange
Coal for the main line
Local power
Daban depot
Cooling
To the station
Hand signals
For emergencies
Narrow gauge amongst the paddies
Empties before sunrise
The watcher
Drift mine
Brick tower
On the crossing
Fighting the wind and gravity
Caziba stop
Winter sun
Big Mine, small mine
Ladle 23
Last days of the SYs at Baotou
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
108 visits
Coal on the move
SY 0639 hurries its load of coal across the Muling River bridge towards Jidong on the service from Donghaikuang Colliery for exchange with Chinese National Railways. Since this photo was taken the bridge has been replaced by a longer and higher structure.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.