tarboat

tarboat club

Posted: 03 Mar 2011


Taken: 04 Oct 2010

1 favorite     0 comments    2 340 visits

See also...

Power Stations Power Stations



Keywords

ireland
shannon
clare
power station
hydro-electric


Authorizations, license

Visible by: Everyone
All rights reserved

2 340 visits


Ardnacrusha power station

Ardnacrusha power station
The Shannon hydro-electric scheme was constructed between 1925 and 1929 to harness the power of the river where it underwent a fall of nearly 35 metres in the final stages of its route to tidal waters at Limerick. The civil engineering works were undertaken by the German company Siemens-Schuckertwerke and on completion the power station at Ardnacrusha was the largest hydro-electric generating plant in the world. Initially there were three vertical shaft Francis turbine generators installed and in 1934 a single vertical shaft Kalan turbine generator was added, giving a total output of 85mw from an average head of 28.5 metres.

(deleted account) has particularly liked this photo


Comments

Sign-in to write a comment.