FreightRail Train Radio Huts
Folder: Railway Locations and Infrastructure.
Constructing huts and then building a trackside comms site using (1) a hut and a mast (2) an existing building and mast (3) an existing building and tower.
199307Mullionrangebuild0003
Pausing from building a hut base to watch the XPT to Dubbo travel past the Mullion Range site.
199307Mullionrangebuild0004
The hut is on the pad, the earth mat is installed. Still waiting for comms and power to be connected.
14 Feb 2009
199307Mullionrangebuild0005
Prepare the concrete mast by running antenna cables and attaching lightning rod and antenna mounting hardware.
14 Feb 2009
199307Mullionrangebuild0006
Prepare the concrete mast by running antenna cables and attaching lightning rod and antenna mounting hardware.
14 Feb 2009
199307Mullionrangebuild0007
The antennas have been attached and cables fixed in position. The mast has been placed in its hole by a crane and the cables run into the hut.
199506radiohut0001
The Train radio site between Menangle and Douglas Park. June 1995.
199506radiohut0002
The Train radio site between Menangle and Douglas Park. June 1995.
199506radiohut0003
The Train radio site between Menangle and Douglas Park. June 1995.
Jump to top
RSS feed- Latest items - Subscribe to the latest items added to this album
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter