199305BuildFRTRhuts0001

FreightRail Train Radio Huts


Folder: Railway Locations and Infrastructure.
Constructing huts and then building a trackside comms site using (1) a hut and a mast (2) an existing building and mast (3) an existing building and tower.

07 Feb 2009

131 visits

199305BuildFRTRhuts0001

The hut base mold ready for a pour.

07 Feb 2009

154 visits

199305BuildFRTRhuts0002

The hut mold being made ready for a pour.

07 Feb 2009

145 visits

199305BuildFRTRhuts0003

Huts and bases ready to be mated.

07 Feb 2009

136 visits

199305BuildFRTRhuts0004

Huts and bases assembled and being painted.

07 Feb 2009

136 visits

199305BuildFRTRhuts0005

Huts with basic electrical fitout but without doors.

07 Feb 2009

142 visits

199305BuildFRTRhuts0006

Interior of a hut,

07 Feb 2009

139 visits

199305BuildFRTRhuts0007

Interior of a hut,

Location:
View on map

14 Feb 2009

150 visits

199307Mullionrangebuild0001

Trench in conduit for comms and power to under where the hut will be placed by crane. There was also conduit to the mast but not in this photo. This shot is from Kerrs Creek site as I didn't get one at Mullion Range.

Location:
View on map

14 Feb 2009

129 visits

199307Mullionrangebuild0002

Using road base to build a raised pad for the hut to site on at Mullion Range site.
18 items in total