NSR 127 - rusty fixings
NSR 127 - repaired areas
NSR 127 - thin fillets
NSR 127 - fillet inserted
NSR 127 - repair blanks
oad - irish wolfie
BM FC - end view
VPC - plate end
VPC - lens
LW - scraper work
BJ - lower tenon
BJ - upright repairs.
AR - machining side bars
gbww[13] - 206 snow - going 2
oaw[HH] - hedgepigs, winter quarters Jan'13
gbww[13] - 206 snow - gone
gbww[13] - 206 snow depth
css / gbw [13] - cloud rip
gbww[13] - 206 snow - going 1
gbww[13] - Jan 2013 snowy trees
css / gbw - morning sky
NSR 127 - cleaning panel
NSR 127 - another module for repair
aav / gbw - high spate
BM FC - interior body planking
CSB - view amidships
BM FC - interior end planks
CSB - full length above
CSB - view for'd
aav / gbw - water rail
aav / gbw - it was raining upstream
SWP - old chair
gbw - Northern Llyn Dinas
gbw - Llyn Dinas with trees
gbw - down is thataway
In mem - Arthur, a real gentleman.
gbw - waterfall into Llyn Dinas
In mem - Arthur B
In mem - Alan Pegler
In mem - Donald Campbell
SCL - TinMan Films at Saltburn
NSR 127 - kit form droplights
CSB - grinding valves
NSR 127 - sanded section
NSR 127 - glossed brackets.
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
369 visits
NSR 127 - holes filled
Having dug out the rusted remains of the fixing screws, some timber plugs have been inserted to give the new fixings something to bite into. The split was glued and clamped shut., The intended result was achieved as this area returned to the proper shape.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.