MF - Porthole out 1
MF - Verdigris - Porthole out 2
MF - deck fittings for fuel
MF - old cockpit (scan)
MF - almost all the deck
MF - old deck (scan)
MF - cabin roof and foredeck
MF - old and new decks
MF - new cockpit deck
MF - new teak cabin roof
MF - cockpit floor test
MF - deck sanding
MF - starboard tank in
MF - port tank in
MF - cabin roof dry fitting
MF - cabin roof laid out
MF cabin roof outline
MF - cabin roof marked
MF - cabin roof trial
MF - cockpit refurbishment
MF - tank refurbisment
MF - finished cleats
MF - stack of cleats
MF - block of cleat blanks
MF - cleat blanks
MF - helm progress 1
MF - helm progress 2
MF - march wheelhouse
MF - new deadwood
MF - more toys
MF - wheelhouse headlining
MF - rudder repaint
MF - wheelhouse door open
MF - wheelhouse
MF - clearview outside
MF - engine as found
MF - stern and rudder
MF - clearview inside
gbw - frosty boat
gbw - crystals in close up
MF - main cabin from wheelhouse
MF - wheelhouse from cockpit
MF - helm modified
MF - helm from wheelhouse door
MF - looking aft in main cabin
MF - Charts from main cabin
MF - galley update
MF - Helm from port side
MF - looking in from side
MF - wheelhouse via windscreen
MF - cockpit drains
MF - relieving tube seacocks
MF - forecabin sanding
MF - engineroom deck
MF - bilge under engine
MF - engine as found 1
MF - forward bulkhead
MF - engine progress
MF - skin fixing
MF - rigging
MF - restored pump
MF - old fuel line
MF - Ballast 4
MF - deck almost finished
MF - foredeck refurbished
MF - caulking knots
MF - reflections
MF - caulking to go
MF - cotton on
MF - caulking gone
MF - engine space
MF - old wheelhouse
MF - Exterior view
MF - looking forward
MF - Ashore for work
MF - new galley
MF - new cabin roof
MF - Afloat in Scotland
MF - cabin and galley
MF - full cabin, forward, after refit
MF - galley in here
MF - rebuilt galley
MF - cabin close up
MF - light fittings
MF - old galley
MF - Starboard side main cabin
MF - portholes
MF - cabin looking forward (before)
MF - fore ballast
MF - cabin side panels
MF - wheelhouse screens
MF - screens fitted
MF - try side screen
MF - old screens
MF - old screens joint
MF - arrival 1
MF - gently up
MF - pugwash
MF - about to unload
MF - here at last
MF - frames under verge
MF - helm knitting
MF - CF - Miller and RSG55022
MF - grab rails
MF - old deck
MF - nail pulled
MF - cockpit verge boards
MF - side deck verge boards
Formation screwing
MF - View aft ; before refit
MF - Cabin to wheelhouse (aft - refitted)
MF - exterior wheelhouse
MF - new sceens glazed
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
354 visits
MF - cockpit progress
Further development in the cockpit, almost the last of the iroko matchboards have just been fitted. Additional LED lighting has been installed.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.