Isolation Hospital
Kelvin Marine Engines
Sound of Sleat
Blades on the bridge
Pork Butcher
Keadby Power Station
Kenyon Hall
Two floors of wallpaper
Asphalt
Royal Hotel
Shunting
Cement works
Minerals at Chasewater
Limekiln
Slag ladle
Haig above the weeds
Back to Asmara
New Engine Mine
Waiting for torpedoes
Monumental Mason
Capped
Northern Fail
Waiting at Temple Meads
Kettell's Restaurant
Stuck
Drum house
Chasewater minerals
Patten Arms Hotel
Ingleton quarry
Keldishaw Kiln
The view from my room
Draw tunnel
Vicar Lane
Corrugated iron in the Dales
Always A Good Programme
Traffic stop
New Pit, Pingot Colliery
Gas
Lifting
Scunthorpe
Orroroo silos
Dukart's aqueduct
Wray's Buildings
Under the loading hopper
Boilers in retirement
Location
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
375 visits
White Bay Power Station
To satisfy the power requirements for the expansion of the Sydney tram and rail network, the New South Wales Government Railways began the first phase of work on The White Bay Power Station in 1912. The plant, constructed in the Federation Anglo-Dutch architectural style, was fully operational from 1917 but two further phases of development, 1923-1928 and 1945-1948, saw the station expand even further. It remained under the control of the department until 1953 when the newly created Electricity Commission of NSW took over. Ownership moved to Pacific Power when NSW electricity was deregulated in 1995.
In later years the generation capacity comprised 186 MW made up of three Australian General Electric turbines with British Thomson-Houston alternators which ran at 1,500 rpm, with a continuous rating of 22 MW, they were numbered 6, 7 and 8. Steam was supplied by 9 Babcock
and Wilcox CTM chain grate boilers. Each boiler produced 80,000 lbs/hour at a pressure of 275 psi and a temperature of 640 deg F. In 1928, a single 20 MW unit supplied by Parsons was brought into use (no.9, In addition a 50 MW, 50 cycle turbo-alternator from Parsons was commissioned in 1951 (no. 1), followed by a second identical unit in 1955 (no. 2). These two sets were erected on the original 'A' station site.
Units 6 to 9 were decommissioned in 1975 and removed, whereafter only the 50 MW Parsons units remained. Thenceforth, the remaining units saw intermittent use; their last intensive use was during power shortages in 1982. The entire power station was closed permanently on 25 December 1983.
The buildings are on the heritage list with some of the generating machinery still in situ.
In later years the generation capacity comprised 186 MW made up of three Australian General Electric turbines with British Thomson-Houston alternators which ran at 1,500 rpm, with a continuous rating of 22 MW, they were numbered 6, 7 and 8. Steam was supplied by 9 Babcock
and Wilcox CTM chain grate boilers. Each boiler produced 80,000 lbs/hour at a pressure of 275 psi and a temperature of 640 deg F. In 1928, a single 20 MW unit supplied by Parsons was brought into use (no.9, In addition a 50 MW, 50 cycle turbo-alternator from Parsons was commissioned in 1951 (no. 1), followed by a second identical unit in 1955 (no. 2). These two sets were erected on the original 'A' station site.
Units 6 to 9 were decommissioned in 1975 and removed, whereafter only the 50 MW Parsons units remained. Thenceforth, the remaining units saw intermittent use; their last intensive use was during power shortages in 1982. The entire power station was closed permanently on 25 December 1983.
The buildings are on the heritage list with some of the generating machinery still in situ.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.