Biligou viaduct
Heading for Jinpeng
Fuxin repair shop
To the collieries
Men at work
Runpast problems
Early light
Poles and signals
Empties in the desert
Huan He Junction
Jinpeng Summit
Should have shot earlier.
Dongchang morning
Exchange sidings
On the curved viaduct
Frosty morning at Tianzhuang
Yet more spoil
Crossing the sands
Walking home
Instructions
The empties are coming!
3000 up!
Approaching Simingyi
Open spaces
Walking on the tracks
5815798303 5afdcd607b o
Waiting at the crossing.
Zhengyang arrival.
Uphill with the coal empties
Horse trouble
Another Fuxin crossing
Zaojiatun
Back to Baiyin
Last ride
Yet another Fuxin crossing
Goodbye Huanan
Crossing loop
Reshui dawn
Dalu bank
On top of the coal tip
Leaving summit tunnel
Hegang in the rain
No.5 mine Sanjiazi
Gulumanhan
Heading towards Chaganhada
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
163 visits
No.3
Not many double track narrow gauge industrial lines around, and certainly not like the Dahuichang Limestone Railway just outside Beijing. There is little room left for doubt as to the number of the locomotive in charge of this rake of empties heading for the loading chutes. Sadly the line only lasted for a few more months before being replaced by lorries. Locomotive No.4 from this line is now undergoing restoration at Boston Lodge on the Ffestiniog Railway in the UK.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.