Lock 13 at Marple proved to be the very devil of a job to clear of mud when the Peak Forest Canal Society set about it with barrow hoist and men with shovels. Each time we started work something would break. The pump would stop working or the hoist failed, or some other disaster would befall the job. Instead of a weekend it took several weeks before it was finally emptied of that black mud. This photo was taken at the beginning of the Lock 13 saga in September 1972.