Storming uphill
Longton
Sunrise on Nanchang Bank
Evening at Kostolac shed
Tipping
Not quite authentic
Newtown Viaduct
Pushing back
Waiting for the token
44422 arrives at Consall
Waiting for the road
Brief sunshine
Pingzhuang action
Jalainur pit
Ground frame
Murky weather
Inside the shed
Bringing home the empties
Bukinje
Pingdingshan shift change
Power station coal
Xiahua
Washery sunrise
Opencast junction
Consall sunshine
Mid-Cheshire Rail Day
Mid-Cheshire Rail Day - Billinge Green
Morning thrash
Over the top
Departing Plumley
Limestone on the narrow gauge
The high tip
Spoil train pass
Glint on the tip run
Simingyi
Clitheroe
Afternoon passenger
Beipiao tracks
Anshan slag banks
Desert Dash
Yijing
Lindong next stop
Peat Railway
Beware
Track gang
Mine railway passenger service
West from Chaganhada
Morning empties
The Pillars of Monaghan
On the crossing
Pushing out
The Driver
Black Five arriving
Crane Train
Goathland crossing
Yijing dirt tip
Mining landscape
Over the top
The unloading point
Contented cows
Jitong memories
Racing the train
Zaojiatun cement works
Approaching the summit
Coal empties
Apple shopping
Fishing platform
Banovici nights
Mixed Gauge
Dahengshan
Shiny ribbons
Tunnel exit
Winter steam
Back to base
The burning tip
Running repairs
Sandaoling sunset
Botizu
Climbing to Wittersham Road
Xizhan Yard
Rebuilding
Tianzhuang Depot
Bennerley Viaduct
Bennerley Viaduct
Colliery shunt
Klenovic
Abandoned
Bukinje moonlight
Consall Station
Swanage Shed
5197 departing Froghall
Cheddleton Freight
SY 1344 Dongchang Colliery
80104 departs Swanage
Bridge Building
Jalainur
On the edge
Leaving Foxton sidings
Foxton Sidings
Barrington Cement Works
Tenterden Bank
Home from the mine
Jitong sunset
Arriving at Corfe Castle
Towards Harman's Cross
Lindow Moss
Hailar Depot
Eastbound passenger
Bi Shui crossing
Advertising totem
Pakis Baru No.1
Darjeeling 19
Power - electric and steam
Foggy morning at Tianzhuang
Bagnall at Caverswall Road
Approaching Shangdian
The crossing
At Sanjing Mine
Empties for Yijing
Anshan slag bank
Baotou slag banks
C2 in the snow
Heading for the summit
Xincheng Tip
Fuli
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
185 visits
Time for a quick adjustment
Loaded trains are banked, by the locomotive from the previous train of empties, from Lixin to the summit of the Huanan Coal Railway. At the summit the brakes are screwed down on the wagons and the train locomotive checked over before the banker drops back to Lixin to pick up its train and continue the journey to the mine.
This wonderful scene can still be observed several times a day during the periods when the line is operating.
This wonderful scene can still be observed several times a day during the periods when the line is operating.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.