tarboat

tarboat club

Posted: 10 Mar 2008


Taken: 14 Apr 2005

0 favorites     0 comments    184 visits

See also...

Chinese Railways Chinese Railways



Keywords

train
china
railway
locomotive
steam
heilongjiang
huanan
interestingness391


Authorizations, license

Visible by: Everyone
All rights reserved

184 visits


Time for a quick adjustment

Time for a quick adjustment
Loaded trains are banked, by the locomotive from the previous train of empties, from Lixin to the summit of the Huanan Coal Railway. At the summit the brakes are screwed down on the wagons and the train locomotive checked over before the banker drops back to Lixin to pick up its train and continue the journey to the mine.

This wonderful scene can still be observed several times a day during the periods when the line is operating.

Comments

Sign-in to write a comment.