  • Altalink 755L 138kV Rebuild

    - 06 Mar 2017
    I never did get around to photographing line 755L which was the only line in the entire province of Alberta built with these specs. 755L is the line with the davit arms on this document:

  • Friday Line Safari

    - 17 Mar 2017 - 1 comment
    I will be visiting the Raymond Dam which is a mini hydro plant with a small 69kV substation and original 69kV line owned by Altalink. I will also be visiting the Stirling Substation which is where the 69kV and 138kV system are interconnected.

  • Altalink Madden 373S Substation

    - 27 Mar 2017 - 1 comment