I decided to take a drive since I took today off and I decided to travel back north to Conowingo Power (now Delmarva Power) territory. I passed their Town Point substation which was rebuilt in 2010 and similar to this one: www.ipernity.com/doc/286325/34283091 Delmarva Power contractor crews were laying a foundation for a new 34.5kV to 4.16kV transformer adjacent to the existing substation.