tarboat's photos with the keyword: carrington

Carrington

04 Nov 2024 2 249
The coal-fired Carrington Power Station was closed in 1991 and demolished soon after. Construction began in late 2009 on the same site to build a new gas-fired plant. The station is a Combined-Cycle Power Plant (CCPP), using natural gas to generate 884MW of electricity. Each power train includes an Alstom GT26 gas turbine, a horizontal triple-pressure Heat Recovery Steam Generator (HRSG), a TOPGAS hydrogen-cooled generator and an Alstom STF15C triple pressure reheat steam turbine with axial exhaust and all other auxiliaries to operate the plant. The total combined power output of the two power trains is 884 MW. It generates enough power to meet the electricity needs of one million homes in the UK and began commercial operation on 18 September 2016. It is majority owned by Irish company ESB Energy.

Polythene plant

08 Apr 2023 142
Petrochemicals have been produced on the Carrington site since 1949. The main output from this plant was polypropylene and polyethylene . Formerly operated by Shell the Carrington site is part of the LyondellBasell Industries Group of Companies which was formed at the end of 2007 by the combination of Basell Polyolefins and Lyondell Chemicals. The majority of the chemical plant here has subsequently been demolished with the LyondellBasell presence vastly reduced.

Insulators

24 Jan 2021 3 220
Large ceramic insulators at the huge substation close to the former site of Carrington Power Station.

Carrington

09 Oct 2019 1 443
Chemical storage vessels at the LyondellBasell plant at Carrington, Greater Manchester. Polythene and polystyrene production here was originally by Shell and it was on this site that polythene was first created.

Polythene and Polyethylene

29 Jan 2012 364
Petrochemicals have been produced on the Carrington site since 1949. The main output from this plant is polypropylene and polyethylene . Formerly operated by Shell the Carrington site is part of the LyondellBasell Industries Group of Companies which was formed at the end of 2007 by the combination of Basell Polyolefins and Lyondell Chemicals.

Cooling tower

29 Dec 2010 434
Cooling plant at the LyondellBasell Industries Group polythene and polyethylene production site at Carrington.

Carrington for polyethylene

26 Jul 2009 1054
Petrochemicals have been produced on the Carrington site since 1949. The main output from this plant is polypropylene and polyethylene . Formerly operated by Shell the Carrington site is part of the LyondellBasell Industries Group of Companies which was formed at the end of 2007 by the combination of Basell Polyolefins and Lyondell Chemicals.

Insulation

23 Jul 2008 307
Towers of ceramic insulation at the mega-substation close to the former site of Carrington Power Station.