3 favorites     2 comments    237 visits


Keywords

arizona
powerlines
powerline
utility poles
transmission line
69kv
SRP
7.2kv
salt river project


Authorizations, license

Visible by: Everyone
All rights reserved

237 visits


SRP 69kV & 7.2kV - Gilbert, AZ

SRP 69kV & 7.2kV - Gilbert, AZ
Some older mid-1980's double-circuit composite line post poles in the background. In the foreground, you've got the steel double-circuit polymer yuk posts.

I never cared for those polymer post steel poles. Many lines of them now plague lines that once featured pre-1966 older crossarms poles with suspensions or composite line post poles.

New 69kV poles are completely steel now as of the late 1990's-early 2000's. Polymer posts have been a standard since between 1994-97.

, , Power Lines have particularly liked this photo


Comments
 David Dahle
David Dahle
Are there any areas of overlap between APS and SRP or are the systems pretty well separated?
9 years ago.
 AstroElectric
AstroElectric
There are lines in Phoenix (the actual city is mostly APS) and Gilbert where both APS and SRP run parallel (mostly on 69kV). I've seen a short double-circuit distribution line with both APS and SRP in Chandler. Their systems are mostly separate otherwise.
9 years ago.

Sign-in to write a comment.