TR6 - getting rid of old roof
TR6 - extra roof repair
TR6 - Cant rail [4 of 4]
TR6 - Cant rail [3 of 4]
TR6 - Cant rail [2 of 4]
TR6 - Cant rail [1 of 4]
TR6 - new door built [cmpt 1] [door repairs 4 of 4…
TR6 - door repairs [3 of 4]
TR6 - door repairs [4 of 4]
TR6 - Cmpt2 ; bulkhead painting
TR6 - bulkhead repairs
TR6 - carriage end
TR6 - cmpt1 : gap filled
TR6 - cmpt3 : bulkhead finished
TR6 - cmpt3 : seat under construction
TR6 - cmpt5 : gloss on bulkhead
TR6 - cmpt4 being painted
TR6 - cmpt 4 : bulkhead and seat
NER2853 - bottom door hinge patterns
TR6 - roof sheet [4 of 9]
TR6 - end gutter [1 of 4]
TR6 - end gutter [2 of 4]
TR6 - end gutter [3 of 4]
TR6 - locks and roof sheet
TR6 - locks and roof sheet [cmpt 5]
TR6 - locks and roof sheet [1 of 3]
TR6 - sitting in the sun (no gutters)
TR6 - finished outside [1 of 5]
TR6 - painted end [2 of 5]
TR6 - shaded side [3 of 5]
TR6 - finished outside [4 of 5]
TR6 - finished outside [5 of 5]
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
81 visits
TR6 - progressing work
Work is progressing on several fronts. The roof planks have been given some protective treatment, including painting. and the exterior has had some minor repairs and painting is in progress.
Peter_Private_Box, Nouchetdu38 have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.