atm - count that
O&S (meme) - year 2059
ESP - 93a - Rotterdam Centraal - July 2008
C-130 [20] : heading south
C-130 [20] / TiG (air) : Lockheed C-130
C-130 [20] : flying approx Sou'West
C-130 [20] : disappearing
C-130 [20] : there were two !
TR17 - inspection in Wales [1 of 46]
TR17 - inspection in Wales [2 of 46]
TR17 - inspection in Wales [3 of 46]
TR17 - inspection in Wales [4 of 46]
TR17 - inspection in Wales [5 of 46]
TR17 - inspection in Wales [6 of 46]
TR17 - inspection in Wales [7 of 46]
TR17 - inspection in Wales [8 of 46]
TR17 - inspection in Wales [9 of 46]
TR17 - inspection in Wales [10 of 46]
TR17 - inspection in Wales [11 of 46]
TR17 - inspection in Wales [12 of 46]
TR17 - inspection in Wales [13 of 46]
TR17 - inspection in Wales [14 of 46]
TR17 - inspection in Wales [15 of 46]
cvd - Newcastle cases : mid October 2020
atm - trumpkin
ScI - CalMac ferry from Kilchoan
ScI - Viaduct at Glenfinnan
ScI - setting out for a sail
ScI - early morning yachts
ScI - oh, deer [3 of 3]
ScI - oh, deer [2 of 3]
ScI - oh, deer [1 of 3]
ScI[08] - Ballachulish Bridge
ScI - lamp standard
ScI - Corran Ferry
ScI - penstocks
ScI - Neptune's Staircase
ScI - no, not posing ...
ScI - Bridge over the Atlantic [2 of 2]
ScI - Crossing Cuan Sound (towards Luing) [2 of2]
ScI - Crossing Cuan Sound (towards Luing) [1 of 2]
ScI[08] - Clachan Bridge [1 of 2]
ScI - CalMac / Isle of Mull [2 of 2]
ScI - CalMac / Isle of Mull [1 of 2]
ScI - Oban control (27 Group ROC)[2 of 2]
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
157 visits
prob / ddd - water damage
This was carefully packed but not totally sealed, and bad weather (strong winds & heavy rain) forced water between the sheets, during transport from the supplier.
The staining would have been very noticeable under varnish, so delivery was not accepted.
Pleased to say that replacements were on their way the next day, at no extra charge. The couple of days delay for the new delivery was insignificant over the full project, actually, we were not kept waiting. The delay only meant we didn't have quite as much lead time to spare as we expected for the varnishing process.
The staining would have been very noticeable under varnish, so delivery was not accepted.
Pleased to say that replacements were on their way the next day, at no extra charge. The couple of days delay for the new delivery was insignificant over the full project, actually, we were not kept waiting. The delay only meant we didn't have quite as much lead time to spare as we expected for the varnishing process.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2026
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
X
Sign-in to write a comment.