Technical School
Maerz Kilns
Hardendale Quarry sidings
Beware
Approaching Shap summit
Away from home
Running round
Whitbarrow Road
Hartleys Brewery
Catcrag Limekiln
14 New Market St, Ulverston
Dawson Fold limekiln
Sea Lock
Langdale
Saddlestone mill
A grand day out
Levens limekiln
On top of the kiln
Row limekiln
Alert driver
Micklam
Threlkeld Quarry railway
Empties arriving
Salvation Army
Brick machine
Coal for the kiln
The Mushroom
Baycliff Haggs limekiln
Technical Terracotta
Ars longa, vita brevis
Continuous kiln
Wet day at the Technical School
Reuse
Middle Skydes kiln
Townhead limekiln
PFR Kilns
Whitehaven in the rain
Florence shaft
Cleator Moor Co-op
Risehow Colliery
Harbour limekiln
Electric winder
Florence mine
Clifton
Cropshall
Location
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
You can copy the above to your favourite mapping app.
Address: unknown
See also...
See more...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
796 visits
Rooscote Power Station
Roosecote Power Station was a gas-fired and former coal-fired power station, in Barrow-in-Furness. The gas-fired station opened in 1991 and was the first CCGT power station to supply electricity to the United Kingdom's National Grid. It was mothballed in 2012 after a proposed biomass power station was cancelled and subsequently demolished in 2014-15.
It was a Combined cycle gas turbine power station, fueled by gas from Centrica's Morecambe Bay field which is landed at nearby Westfield Point (left background). The station generated electricity using one 165 MWe Alstom GT13E gas turbine, its associated alternator having a terminal voltage of 15.75 kV, rated at 210MVA, from which the exhaust gases at 520C pass through one CMI heat recovery steam generator. Steam from this powers one 63MWe steam turbine, with its alternator having a terminal voltage of 12.5 kV. The station had a thermal efficiency of 49%. The electricity generated entered the National Grid, via a transformer, at 132 kV, where it powers part of the United Utilities (former NORWEB) network. By March 2012 it was reconfigured to allow operation in the Short Term Operating Reserve market. The plant employed 33 people.
It was a Combined cycle gas turbine power station, fueled by gas from Centrica's Morecambe Bay field which is landed at nearby Westfield Point (left background). The station generated electricity using one 165 MWe Alstom GT13E gas turbine, its associated alternator having a terminal voltage of 15.75 kV, rated at 210MVA, from which the exhaust gases at 520C pass through one CMI heat recovery steam generator. Steam from this powers one 63MWe steam turbine, with its alternator having a terminal voltage of 12.5 kV. The station had a thermal efficiency of 49%. The electricity generated entered the National Grid, via a transformer, at 132 kV, where it powers part of the United Utilities (former NORWEB) network. By March 2012 it was reconfigured to allow operation in the Short Term Operating Reserve market. The plant employed 33 people.
(deleted account) has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
X
Sign-in to write a comment.