The new hob arrived today so I set to and measured up to build a case for it. After two or three ideas which I scrapped I now have the plan sorted. I was going to cut the wood up today for the base and stays but the rain arrived. Since I got a second freezer which went into the workshop I have no room to work there and intended take my portable workbench outside but of course the weather scuppered that idea. I checked on the wiring set up and found it was set to factory default which is phase 3 so I will have to modify that to phase 1 a simple job all is there to sort it. While I am doing this job I have decided it would be best to rewire and fit a new junction box. So I managed to make my self work again but that is when I am in my own little world.
Jenny texted me again today rubbing it in of course. Her and Mandi were sitting outside at 8:30 tonight drinking cocktails and the temps were still 100f.
Right time for me to check on what I need for the task ahead good job there is no panic it may take a eek or so.