Wire routing
Added ISP connector
Hopefully the final programming
Insulation only works if it doesn't slip
Back to an orderly state
OSHPARK again
Target for fan-speed upgrade
SMD assembly done
Test fit
Preparing spacers
One spacer done
Done with soldering
BLDC commutation signal
Signal after comparator
Side view
Top view
BLDC commutation signal
Not enough wire
Fixed safety-earth cable
Some shrinking tube for mechanical support
That didn't last very long
YOUYUE 858D+ PCB
YOUYUE 858D+ PCB
Good policy - wasn't implemented
OPTO isolation slot
Hrrrmmp!
Thermo couple
I had to redo the lousy ground wire
IMGP8559.JPG
Not so safe safety-earth connetion
Not so safe safety-earth connetion
Doesn't stick and melts when device is on
IMGP8557.JPG
IMGP8553.JPG
IMGP8558.JPG
Misaligned bolt hole
IMGP8550.JPG
IMGP8549.JPG
IMGP8552.JPG
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
203 visits
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.