WipeJoint122015 0922
WipeJoint122015 0923
WipeJoint122015 0924
WipeJoint122015 0925
WipeJoint122015 0926
WipeJoint122015 0927
WipeJoint122015 0928
WipeJoint122015 0929
Jersey 084 Cobar area
GoombungeeTelstraHut 1179
GoombungeeTelstraHut 1181
ToogoolawahExch0316 219
ToogoolawahExch0316 227
Bell042016 0555
Bell042016 0557
Pillar Pit 1011
Esk0716 1596
KingaroyMailCentre0317 2290
KingaroyTeleExch0317 2291
KingaroyTeleExch0317 2292
PublicPhones 0217 1826
CommsLinkTestSheet1
CommsLinkTestSheet2
MooreTeleExch 0318 3399
MooreTeleExch 0318 3402
Jersey 078 Cobar area
Jersey 082 Cobar area
Jersey 079 Cobar area
GowrieJunct 0618 3692
GowrieJunct 0618 3694
Evergreen SCAX 272603
WipeJoint122015 0920
WipeJoint122015 0919
WipeJoint122015 0918
WipeJoint122015 0917
WipeJoint122015 0916
WipeJoint122015 0915
WipeJoint122015 0914
WipeJoint122015 0911
WipeJoint122015 0909
WipeJoint122015 0908
WipeJoint122015 0907
WipeJoint122015 0906
WipeJoint122015 0905
WipeJoint122015 0904
WipeJoint122015 0903
WipeJoint122015 0901
WipeJoint122015 0900
WipeJoint122015 0899
WipeJoint122015 0898
WipeJoint122015 0897
WipeJoint122015 0896
WipeJoint122015 0895
WipeJoint122015 0894
WipeJoint122015 0893
WipeJoint122015 0892
WipeJoint122015 0891
WipeJoint122015 0890
WipeJoint122015 0889
WipeJoint122015 0888
WipeJoint122015 0887
WipeJoint122015 0886
WipeJoint122015 0885
WipeJoint122015 0884
WipeJoint122015 0883
WipeJoint122015 0882
Istanbul102015 0085
Istanbul102015 0084
TelstraPTnWireless 816
TelecomPitsnPillar 815
TelecomManholeCover 814
NBN FibreCab 29
CommsPits 30
Train Radio Dwg0001
Train Radio Dwg0002
TelecomsTestSheet
Duckadang0315 910 copy
Duckadang0315 908 copy
Duckadang0315 905 copy
Duckadang0315 902 copy
PoleReplacement0515 22
PoleReplacement0515 21
PoleReplacement0515 20
PoleReplacement0515 19
PoleReplacement0515 16
PoleReplacement0515 13
PoleReplacement0515 11
PoleReplacement0515 10
PoleReplacement0515 09
PoleReplacement0515 07
PoleReplacement0515 06
Jersey 193c Tibooburra TPA 010307 087
Toolbox201501 689
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
209 visits
WipeJoint122015 0921
The jointer uses an LPG torch to melt solder (60 lead/ 40 tin) which is wiped around the cable, using a piece of hide to build a thickness of solder which seals the cable and gives some strength to the joint. Sterene, a fat based product, is melted onto the assist the wiping process.
Paper insulated lead-covered cable was damaged by NBN builders placing too much gear in the cable pit. Cable jointers from Telstra are repairing the water-damaged circuits. They were working at this and another nearby junction pit and pillar.
Paper insulated lead-covered cable was damaged by NBN builders placing too much gear in the cable pit. Cable jointers from Telstra are repairing the water-damaged circuits. They were working at this and another nearby junction pit and pillar.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.