John Oram

John Oram club

Posted: 05 Nov 2017


Taken: 05 Nov 2017

0 favorites     0 comments    98 visits

1/250 f/4.0 7.0 mm ISO 100

Panasonic DMC-FZ200

EXIF - See more details

Location

Lat, Lng:  
You can copy the above to your favourite mapping app.
Address:  unknown

 View on map

See also...


Keywords

Lee on Solent
Innovation Centre
Daedalus Development
Fareham Innovation Centre
200_3_P1030601CE


Authorizations, license

Visible by: Everyone
All rights reserved

98 visits


Fareham Innovation Centre Phase 2 (10) - 5 November 2017

Fareham Innovation Centre Phase 2 (10) - 5 November 2017
As Phase 2 of Fareham Innovation Centre nears completion, comparisons can be made with my photograph of 25 October 2017. The trench which had occupied part of the roadway has been filled in and two-way traffic restored. At roof level, much of the orange guard rail has been removed and, presumably, will be replaced by the grey, permanent structures seen on the original building (and just visible in this picture).

200_3_P1030601CE

Comments

Sign-in to write a comment.