Stiffleaf's photos

southwark cathedral , london

30 Aug 2010 188
east side of the north transept, late c13

southwark cathedral , london

30 Aug 2010 195
c13 details in the crossing

southwark cathedral , london

30 Aug 2010 170
c13 details in the crossing

southwark cathedral , london

30 Aug 2010 188
the choir was begun in 1212, with a very up to date design of an apparent triforium rather than a gallery.

southwark cathedral , london

30 Aug 2010 193
the choir was begun in 1212, with a very up to date design of an apparent triforium rather than a gallery. the reredos dates from the early c16, though it has hardly an inch that is unrestored.

southwark cathedral , london

30 Aug 2010 162
the choir was begun in 1212, with a very up to date design of an apparent triforium rather than a gallery.

southwark cathedral , london

30 Aug 2010 172
the choir was begun in 1212, with a very up to date design of an apparent triforium rather than a gallery.

southwark cathedral , london

30 Aug 2010 193
late c13 brackets high in the crossing

southwark cathedral , london

30 Aug 2010 202
late c13 brackets high in the crossing

southwark cathedral , london

30 Aug 2010 181
view west through the c16 reredos, into the c13 choir

southwark cathedral , london

30 Aug 2010 185
north choir aisle looking west, started in 1212

southwark cathedral , london

30 Aug 2010 202
stiffleaf is rare here; this is on the mid c13 bar tracery window on the south side of the retrochoir

southwark cathedral , london

30 Aug 2010 200
a mid c14 filigree of tracery filled the two arches between the choir and retroquire, being filled in and made blind when the c16 reredos was built

southwark cathedral , london

30 Aug 2010 209
the chandelier of 1680 has an ornate chain, with the crown very firmly over the mitre

southwark cathedral , london

30 Aug 2010 208
the tracery of the south transept windows was designed in the mid c14, just as dec. goes perp.

southwark cathedral , london

30 Aug 2010 207
the vault of the south transept is mostly a rebuild by blomfield of the late c19, the transept itself was rebuilt from c.1303-1360

southwark cathedral , london

30 Aug 2010 213
the c13 retroquire is an early experiment in hall church design, and gives the impression of being in a forest of columns.

southwark cathedral , london

30 Aug 2010 191
the mid c13 retroquire is an early experiment in hall church design, and gives the impression of being in a forest of columns. most of the capitals are moulded, the columns show an early example of the 4 shafts 4 hollows so popular later on.

94228 items in total