Bügel
Valve Chest
Bangladesh Parliament Building - South Plaza
Kamzík TV Tower, a striking 194-meter-tall landmar…
Slab Carrier
HWW Salts Mill Saltaire West Yorkshire 14th April…
Schiffsjunge :)
The Silent Industry: Schloss Hof's Forgotten Backb…
HWW Salts Mill Saltaire West Yorkshire 14th April…
Portland Stone
Nicht nur Nieten
Textile Factory BB
Sewage treatment
Stromfresser im Abseits
Zimmer mit Aussicht
Pen-y-Clyn Mine
Coastal crane
Rock Ferry Pier
Floor catalogue
Refining
Painting Fuel Tank 0525 0472
Checking the Formwork 0485
Pouring 0502
Quarry bunkers
Steam winder
Santiago
Reckitt's chimney
Drypool
Lock 11
Castle or Quarry?
Balmoral
Cutting Table 0026
Maldon flour mill
Trencherfield Mill
Lifeboat Drill
Tender Water Level 20250218 10 40 35 Pro
Lostock reflections
Imerys Aluminates, Dunkirk
Air Tanks from DH41 20250215 13 59 15 Pro
Sandblasters Working on DH41 0015[1]
Mode Wheel
WP 20250123 14 47 58 Pro
Ed Shoveling Forward 20250222 12 48 43 Pro
Canada Dock
Work Area 20250116 11 13 31 Pro
1/1312 • f/1.8 • 4.0 mm • ISO 32 •
Apple iPhone SE (3rd generation)
iPhone SE (3rd generation) back camera 3.99mm f/1.8
EXIF - See more detailsSee also...
" Bilder aus der Region wo ich wohne... Photos de la région où je vis ...Pictures from the region where I live ..."
" Bilder aus der Region wo ich wohne... Photos de la région où je vis ...Pictures from the region where I live ..."
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
389 visits
Permanant Way Maintenance 0309
The track between the platform and the shed was found to be a little out-of-gauge due to sleeper ageing. This photo shows the rails lifted and put aside and the old sleepers (all timber) removed. The old ballast and soil are being moved to the southern end of the site using the loader. The rails will be relaid using a mix of steel and timber sleepers, and gravel ballast. April 2025.
The PiP shows the worksite from the other end. The red board indicates the line is not to be used. The green loader can be seen getting another scoop of spoil for removal. The shunt tractor is parked. It will be used at the end of the day to pull loco 106 back into the shed. The rear of one of the railmotors is seen in the shed. It is having a variety of passenger upgrades done.
The replaced sleepers will be cut into shorter lengths and used in light-up of the steam locos.
The PiP shows the worksite from the other end. The red board indicates the line is not to be used. The green loader can be seen getting another scoop of spoil for removal. The shunt tractor is parked. It will be used at the end of the day to pull loco 106 back into the shed. The rear of one of the railmotors is seen in the shed. It is having a variety of passenger upgrades done.
The replaced sleepers will be cut into shorter lengths and used in light-up of the steam locos.
SV1XV has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2026
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
X
Sign-in to write a comment.