199304burilda0002
199304burilda0004
199304burilda0003
199304burilda0005
199304burilda0007
Grafton_flood0001
Grafton_flood0002
Grafton_flood0003
Grafton_flood0004
Tmba model trains 09 001
Tmba model trains 09 002
Tmba model trains 09 003
Tmba model trains 09 004
Tmba model trains 09 007
Tmba model trains 09 008
Tmba model trains 09 009
Tmba model trains 09 010
Tmba model trains 09 012
Tmba model trains 09 013
Tmba model trains 09 014
Tmba model trains 09 015
Tmba model trains 09 016
Tmba model trains 09 018
196701Campbelltown0002
196701Campbelltown0001
196701Richmond0001
196701Richmond0002
196701Richmond0003
196701Redfern0002
196701Redfern0001
wherewasit? Burilda!
NSWroadrailatlashamlyn1ed
Happy___________
199308Ulantunnel4Up0005
199308Ulantunnel3Dn0004
199308Ulantunnel3Up0003
199308Ulantunnel3Up0002
199308Ulantunnel3Up0001
199304Ulantunnel4Dn0008
199304Ulanloop0009
199304Ulantunnel4Up0007
199304UlanlineCogganCk0006
199304UlanlineCogganCk0005
199304Ulantunnel3Dn0004
199304Ulantunnel2Dn0002
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
82 visits
199304burilda0001
The former Burilda loop location showing the staff hut, main and loop tracks and the staff exchange platform.Looking south, Up direction, towards Gap.The radio hut and mast will go just past the timber power pole. April 1993.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
15 Nov 2011 ARTC New passing loop at Burilda another boost for Hunter Valley rail corridor
Australian Rail Track Corporation (ARTC) has continued its drive to enhance the efficient movement of coal along the Hunter Valley Coal corridor with the construction of a new passing loop at Burilda, between Werris Creek and Breeza.
The passing loop cost around $13.8 million and involved ARTC constructing new track to accommodate 82 wagon coal trains.
This significant infrastructure project required the installation of 1,520m of track including 60kg rail, digital signal technology and concrete sleepers.
Construction took five months to complete.