RERM - sign

RERM - Ravenglass Museum (Big Saloon)


Folder: RAVENGLASS & ESKDALE RAILWAY
The Ravenglass & Eskdale Railway Museum.

Synolda, especially when in steam, is a favourite exhibit from the collections.

The Museum was closed during 2016/2017, as an extensive new display space was under construction. This was opened in late June 2017 by Paul Atterbury.
SRR built a "walk-through replica" of the 3ft gauge "Big Saloon" - which is displayed in the footprint of the original buildi…  (read more)
  • RERM - sign
  • RER - Synolda 1
  • RER - Synolda headshunt
  • RER - Boot station
  • RERM - replica 3ft waggon
  • RERM - platform view
  • RERM - old station building
  • RERM - site view 1
  • RERM - site view 2
  • RERM - inside 1 on 22jan17
  • RERM - inside 2 on 22jan17
  • RERM - old and new
  • RERM - old building
  • RERM - outside view on 22jan17
  • RERM - outside progressing
  • RERM - floor screeded
  • RERM - slates on
  • RERM - The Green
  • RERM - bs - big saloon on shed
  • RERM - bs - another project arrives at Haltwhistle
  • RERM - bs -  last two big bits
  • RERM - bs - largest piece
  • RERM - bs - roof remains
  • RERM - bs -  various large sections
  • RERM - bs - side and door 1
  • RERM  - bs - worst side panel
  • RERM - bs - for sale
  • RERM - bs - corner patch
  • RERM - bs - damaged corner 1
  • RERM - bs - damaged corner 2
  • RERM - bs - damaged corner 3
  • RERM bs - damaged corner 4
  • RERM - bs - damaged vertical / door post
  • RERM - bs - damaged corner 5
  • RERM - bs - for sale removal
  • RERM - bs - air vent interior
  • RERM - bs - repairs in progress
  • RERM - bs - distorted
  • RERM - bs - original panel cleaned
  • RERM - bs - six roof sticks before
  • RERM - bs - oversize repair
  • RERM - bs - roof stick ends
  • RERM - bs - under repair
  • RERM - bs - repaired old end arch
  • RERM - bs - holes repaired
  • RERM - bs - chamfer details
  • RERM - bs - new to old
  • RERM - bs - adding in the old
  • RERM - bs - structural dry build 1
  • RERM - bs - structural dry build 2
  • RERM - bs - structural dry build 3
  • RERM - bs - new floor
  • RERM - bs - colour matching
  • RERM - bs - old door repairs
  • RERM - bs - old door panels
  • RERM - bs - new door frame
  • RERM - bs - new door planked
  • RERM - bs - planking progress
  • RERM - bs - interior planks
  • RERM - bs - exterior view of planking
  • RERM - bs - roof dry fit
  • RERM - bs - air vent
  • RERM - bs - joint in undercoat
  • RERM - bs - gloss topcoat
  • RERM - bs - glossed roof
  • RERM - bs - glossed interior
  • RERM - bs - exterior gloss
  • RERM - bs - van loaded
  • RERM - bs - delivery time
  • RERM - starting again
  • RERM - bs - cills and floor
  • RERM - bs - floor and some side sections
  • RERM - bs - right a bit
  • RERM - bs - groove clean
  • RERM - bs - end in place
  • RERM - bs - roof
  • RERM - bs - who left that there
  • RERM - bs - fitting the floor
  • RERM - progress supervisor
  • RERM - painting gutter
  • RERM - bs - window beads
  • RERM - bs - legless
  • RERM - bs - first fix seats
  • RERM - bs - power supply

117 items in total