No.25 - roof finish
No.25 - seats varnished
WR - hull filled
WR - hull after
WR - numbers 2
WR - numbers 1
WR - hull during work
O&S - sawdust 1
CF - sping clips
O&S - sawdust 2
GT - tight joint
WR - brass fittings
WR - birdseye again
WR - old hull interior
WR - hull refresh
WR - loaded up
WR - off to poole
No.25 - seats finished
O&S - art?
WR - at Poole 2
ESP - 94a / O&S - old projector [1 of 2]
mods - PGB - angle helmet
WR - Rescue squad at Barnstaple
No.25 - seats done 2
No.25 - seats done 1
No.25 - seats in build
No.25 - roof trial
BC - door fitted
BC - heritage train
No.25 - on shed
BC - vip trip 1
BC - first purchase
CSB - engine as arrived
CSB - ski boat, as arrived
SWP - small table
WR - welcome home
WR - work in progress
WR[HI] - old boathouse
No.25 - bogies
SWP - honours boards
No.25 - in flight
No.25 - open door
No.25 - full length internal
No.25 - ready or not here she comes
No.25 - peeping out into the wide world
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
247 visits
No.25 - seats start
Begining to build the seats into the replica Ashbury.
Starting at the mid-point and working out to the doorways.
The specific locations were the result of detailed research, including examining images and records of physical evidence in the buffet car.
Starting at the mid-point and working out to the doorways.
The specific locations were the result of detailed research, including examining images and records of physical evidence in the buffet car.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.