Altalink 138kV - Cypress County, AB

Altalink


Folder: Canada

Altalink 138kV - Cypress County, AB

Altalink Al Rothbauer 321S Substation

Altalink 138kV - Medicine Hat, AB

21 Apr 2018 125
A dedicated 138kV line from the Bowmanton Substation terminates at the Al Rothbauer Substation. The original line that went to the Medicine Hat Substation now branches north to the Suffield Substation.

Altalink Al Rothbauer 321S Substation

Altalink Al Rothbauer 321S Substation

21 Apr 2018 145
This switching station interconnects two 138kV transmission lines and interconnects them with the adjacent Medicine Hat Brier Park Substation.

Altalink 138kV - Medicine Hat, AB

Altalink 138kV - Medicine Hat, AB

21 Apr 2018 2 149
This is somewhat of an interesting angle structure as it must be a new spec Altalink uses.

Altalink 138kV - Medicine Hat, AB

Altalink 138kV - Medicine Hat, AB

21 Apr 2018 133
Always nice to see glass insulators being used on new lines.

Altalink 138kV - Medicine Hat, AB

21 Apr 2018 1 137
The dedicated line terminates at the Al Rothbauer Substation. The other line branches north and serves a few substation before terminating in Brooks.

Altalink 138kV - Medicine Hat, AB