Altalink
Folder: Canada
Altalink 138kV - Cypress County, AB
|
|
|
Altalink Al Rothbauer 321S Substation
|
|
Altalink 138kV - Medicine Hat, AB
|
|
A dedicated 138kV line from the Bowmanton Substation terminates at the Al Rothbauer Substation. The original line that went to the Medicine Hat Substation now branches north to the Suffield Substation.
Altalink Al Rothbauer 321S Substation
|
|
Altalink Al Rothbauer 321S Substation
|
|
This switching station interconnects two 138kV transmission lines and interconnects them with the adjacent Medicine Hat Brier Park Substation.
Altalink 138kV - Medicine Hat, AB
|
|
|
Altalink 138kV - Medicine Hat, AB
|
|
|
This is somewhat of an interesting angle structure as it must be a new spec Altalink uses.
Altalink 138kV - Medicine Hat, AB
|
|
Altalink 138kV - Medicine Hat, AB
Altalink 138kV - Medicine Hat, AB
|
|
|
The dedicated line terminates at the Al Rothbauer Substation. The other line branches north and serves a few substation before terminating in Brooks.
Altalink 138kV - Medicine Hat, AB
|
|
Jump to top
RSS feed- Latest items - Subscribe to the latest items added to this album
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter