David Dahle

David Dahle

Posted on 02/05/2014


Photo taken on February  4, 2014


See also...

The Powerline Graveyard The Powerline Graveyard



Keywords

13.8kV
4160V
SOS05
SOS 13.8kV


Authorizations, license

Visible by: Everyone
All rights reserved

139 visits

Xcel Energy - Sioux Falls, SD

Xcel Energy - Sioux Falls, SD
The 4160V cap bank ( www.ipernity.com/doc/ndlinegeek/29210819 ) after it got redone in preparation for switching SOS05 over to 13.8kV. The replacement of the cap bank and elimination of the normally-open tie to the CLF01 4160V circuit means Xcel is VERY close to being able to switch this circuit over to the 13.8kV system.

André J.(Lineman80), Tony Glen, Power Scale Modeler and 2 other people have particularly liked this photo


Comments
Power Lines
Power Lines
I wonder if you'll be able to catch 'em changing the taps on the transformers?
4 years ago.
David Dahle
David Dahle
This cap bank is now in full operation.
4 years ago.