NER 7cmpt - VCT image

NER 2853 - 7 compartment composite


Folder: TANFIELD RAILWAY
We have been commissioned by the owner of this carriage to carry out a number of restoration tasks. When the carriage arrived, the number of this 7 compartment composite was not known. However, a little detective work has produced 22853, which is the post 1923 number for NER 2853. The carriage consists of two 3rds then three firsts and at the other end are two more 3rds. This format is Diagram 64 …  (read more)
  • NER 7cmpt - VCT image
  • NER 7cmpt - worst corner
  • NER 7cmpt - crossing the road
  • NER 7cmpt - unloading in CoDurham
  • NER 7cmpt - stored in CoDurham
  • NER 7cmpt - gift wrapped arrival
  • NER 7cmpt - Ready to Lift
  • NER 7cmpt - hanging around
  • NER 7cmpt - easy does it
  • NER 7cmpt - in she goes
  • NER  7cmpt - arrival right inside
  • NER 7cmpt - next job; line her up
  • NER 7cmpt - lined up
  • NER 7cmpt - so what do I do first
  • NER 7cmpt - painted handle
  • NER 7cmpt - drawing; Diagram 26
  • NER 7cmpt - Class mark
  • NER 7cmpt - Number
  • NER 7cmpt - wallpaper 01
  • NER 7cmpt - blind fabric 1
  • NER 7cmpt - SR May 2015
  • NER 7cmpt - kitchen window
  • NER 7cmpt - nails
  • NER 7cmpt - wasted bolt
  • NER 7cmpt - bolections
  • NER 7cmpt - doorway
  • NER 7cmpt - cutouts
  • NER 7cmpt - dry fit centre
  • NER 7cmpt - dry fit corner
  • NER 7cmpt - side repaired
  • NER 7cmpt - writing 1
  • NER 7cmpt - writing 2
  • NER 7cmpt - writing 3
  • NER 7cmpt - writing 4
  • NER 7cmpt - writing 5
  • NER 7cmpt - writing 6
  • NER 7cmpt - writing 7
  • NER 7cmpt - inside end
  • NER 7cmpt - upholstery
  • NER 7cmpt - bulk head top
  • NER 7cmpt - floor done
  • NER 7cmpt - underframe
  • NER 7cmpt - end arch
  • NER 7cmpt - roof hoops
  • NER 7cmpt - make cant rail
  • NER 7cmpt - intCRfitted
  • NER 7cmpt - fitted Cant Rail
  • NER 7cmpt - bulkhead repair
  • NER 7cmpt - bulkhead repaired
  • NER 7cmpt - three
  • NER 7cmpt - painted planks
  • NER 7cmpt - cross light
  • NER 7cmpt - warning sign
  • NER7cmpt - warningsign
  • NER 7cmpt - door marks
  • NER 7cmpt - valve before
  • NER 7cmpt - valve / flap
  • NER 7cmpt - new roof
  • NER 7cmpt - new roof fitting
  • NER7cmpt - more roof work
  • NER 7cmpt - roof expanse
  • NER 7cmpt - first door done
  • NER7cmpt - test hang
  • NER 7cmpt - dry fit panels
  • NER 7cmpt - end panel fitting
  • NER7cmpt - external view end July 2016
  • NER7cmpt - joiner's mark
  • NER7cmpt - first infill (ceiling)
  • NER7cmpt - oct 2016 progress
  • NER7cmpt - third class ceiling infill
  • NER7cmpt - droplight springs
  • NER7cmpt - spring detail
  • NER7cmpt - completed headstock
  • NER7cmpt - detail
  • NER7cmpt - headdstock fitted1
  • NER7cmpt - headstock fitted 2
  • NER7cmpt - headstock to replace
  • NER7cmpt - window progress
  • NER7cmpt - kitchen side
  • NER7cmpt - workshop side
  • NER7cmpt - doors open
  • NER7cmpt - end and side
  • NER7cmpt - exterior paint
  • NER7cmpt - third interior

98 items in total