PQR - Titan crane north breakwater
PQR - Titan crane south breakwater
PQR - more leg work
PQR - Shunting at the quarry
PQR - Van lift at Maud
PQR - unloading
PQR - display access Beamish
PQR - arrival backing down
PQR - arrival at Maud 01
PQR - alongside moves
PQR - Steam Railway in Nov 2016
PQR - official opening
PQR - Nigel Sawford
PQR - Maud team two
PQR - Maud team one
PQR - internal graffiti detail
PQR - end of the day at Maud
PQR - convict and box vans
PQR - attendees
PQR - steady pull
PQR - start the engine
PQR - nearly there
PQR - start the pull
PQR - sideview
PQR - rehooking
PQR - ramp built
PQR - maker's plate
PQR - here we are
PQR - gate shot
PQR - Beamish : 3 of 3
PQR - Beamish : 2 of 3
PQR - Beamish : 1 of 3
PQR - almost there
PQR - graf 103
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
499 visits
PQR - quarry train
A view of the convicts and their escorts boarding the train, probably near the prison rather than at the quarry.
Two points to note, firstly this was probably just after ww2 and secondly, from the reflection and lack of visible bars, the small windows are glazed.
The Loco is "Edward VII" and looks like a good clean is needed.
not my image
Two points to note, firstly this was probably just after ww2 and secondly, from the reflection and lack of visible bars, the small windows are glazed.
The Loco is "Edward VII" and looks like a good clean is needed.
not my image
ColRam, Joe, Son of the Rock, Ecobird, Leo W and 3 other people have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.