NER 7cmpt - valve / flap
NER 7cmpt - door marks
NER 7cmpt - roof expanse
NER 7cmpt - new roof fitting
NER 7cmpt - dry fit panels
NER7cmpt - more roof work
NER7cmpt - warningsign
NER7cmpt - test hang
NER7cmpt - joiner's mark
NER7cmpt - external view end July 2016
NER7cmpt - completed headstock
1001 - hopper waggon
NER70 - Third Class seating
NER 7cmpt - Number
NER 7cmpt - doorway
NER986 - before rescue
NER986 - outside the works
NER 7cmpt - first door done
NER 7cmpt - warning sign
NER 7cmpt - three
NER 7cmpt - painted planks
NER 7cmpt - bulkhead repaired
NER 7cmpt - cross light
NER 7cmpt - bulkhead repair
NER 7cmpt - writing 7
NER 7cmpt - drawing; Diagram 26
NER 7cmpt - make cant rail
NER 7cmpt - end arch
NER 7cmpt - roof hoops
1001things / NER986 - third brake composite
NER 7cmpt - underframe
NER 7cmpt - floor done
NER 7cmpt - bulk head top
NER 7cmpt - blind fabric 1
NER 7cmpt - wallpaper 01
NER 7cmpt - inside end
NER 7cmpt - upholstery
NER 7cmpt - side repaired
NER 7cmpt - writing 6
NER 7cmpt - writing 5
NER 7cmpt - writing 4
NER 7cmpt - writing 3
NER 7cmpt - writing 2
NER 7cmpt - writing 1
NER 7cmpt - dry fit corner
NER 7cmpt - painted handle
NER 7cmpt - bolections
NER 7cmpt - Class mark
NER 7cmpt - SR May 2015
NER 7cmpt - so what do I do first
NER 7cmpt - lined up
NER 7cmpt - next job; line her up
NER 7cmpt - in she goes
NER 7cmpt - hanging around
NER 7cmpt - Ready to Lift
NER 7cmpt - stored in CoDurham
NER 7cmpt - unloading in CoDurham
NER 7cmpt - crossing the road
NER 7cmpt - easy does it
NER 7cmpt - gift wrapped arrival
NER 7cmpt - worst corner
NER 7cmpt - VCT image
1001 - NER carriage
BM - eve - NER 818
NER 70 - looking in
NER70 - TiG - spinner
NER70 - three doors
NRM - Bobo - part painted
NER70 - other side repairs
NER70 - starting floor
NER70 - new side and floor
NER70 - new lower floor
NER70 - new top floor
NER70 - adding plank
NER70 - refaced
NER70 - first small end
NER70 - top small end
NER70 - floor planks
NER70 - old floor
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
459 visits
NER 7cmpt - new roof
Stack of replacement roof planks await fitting.
Normally, we dry fit planks and then remove them in order to paint the ceiling face. However, these will be covered by another layer, so will only be treated with knotting and preservative before installation.
Normally, we dry fit planks and then remove them in order to paint the ceiling face. However, these will be covered by another layer, so will only be treated with knotting and preservative before installation.
Don Sutherland has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.