WR - finished deck
WR - Varnished deck
WR - ready for return
WR - stability test
WR - unveiling
WR - on the motorway
WR - having a trip out!
No.25 - in undercoat
No.25 - primer
No.25 - paint the gutter
No.25 - internal panels and floor
No.25 - roof above
RER - Maid of Kent
No.25 - Cake and edibles
No.25 - bye bye : see you in May
No.25 - the journey begins
No.25 - first passenger
No.25 - light fitting
No.25 - inside in daylight
No.25 - peeping out into the wide world
No.25 - ready or not here she comes
No.25 - full length internal
No.25 - open door
WR - boat afloat
RER - sofa as installed
No.25 - Body building
BC - joint repairs
SWP - headboard
BC - joint repairs
No.25 - unloading underframe
No.25 - nearly in
SCL - new interior
SCL - lift begins
SCL - saltburn car in place
SCL - in the air
SCL - Marske car down
SCL - lift controls
SCL - water tank end
SCL - upper end wheels
SCL - underframes waiting
SCL - water chute (crane)
SCL - loading in progress
SCL - PM wiring
SCL - new halfway
SCL - on test
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
297 visits
WR - cox'n's platform
After the intial contract had been completed, WHLT were so impressed with the standard of our work that they asked us to produce a number of additional items. These were made in Haltwhistle, and fitted in Whitby (mostly by Ian Y).
By far the largest was the coxswain's platform. Other items included a couple of small lockers, several grab rails, the rudder and a tiller.
By far the largest was the coxswain's platform. Other items included a couple of small lockers, several grab rails, the rudder and a tiller.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.