1) Verdun France 1969
2) Verdun France 2019
Hemingfield upcast
Lindley cum Quarmby Huddersfield West Yorkshire 30…
Crowned
Sandaoling Xinjiang China 16th November 2014
Leicester Leicestershire 12th December 2020
Loxley
Butter Factory
Colliery steam on the main line
Explosives
Padstow Cornwall 11th May 2021
To the tip
HFF Great Central Railway, Loughborough 15th Novem…
Up the Brocken
Warmsworth Cliff Quarry
4F leaving Haworth
Swanage brick
Leaving Disley Tunnel
K1 at the crossing
Dirt tipping
Heading west
Beamish Colliery
Cottam
Astley Bridge Mill
West Burton
Scottish cement
The Dry Creek crossing
HFF Great Central Railway Rothley Leicestershire 2…
Nanzhan yard
Barnetby Lincolnshire 9th March 2012
Moorish
Rondomskrik
70013 Stoke Tunnel 18th October 2013
Sunburst
Durdevik Mine
Workshop and offices
Marefield Leicestershire 15th April 2021
Cawley Nursery
Virginia Mills
Shibam Hadramaut Yemen 1993
The Azores Ponta Delgado church August 2013
Distant painting
Paleisheuwel
Great Central Railway Quorn Leicestershire 18th Ap…
Location
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
104 visits
Hybrid
Back in January 2020 it was great to see new industrial locomotives being built in the UK. This was one of two hybrid CBD90 Bo-Bo locomotives being built by Clayton Equipment Ltd at Burton-on-Trent for Tata Steel at Port Talbot. One other locomotive of this type had already been delivered to Tata. Electric drive is powered by a large bank of lead acid batteries which are charged by a Deutz diesel running in the front compartment.
Further orders have since been gained from Tata Steel and also for two Hybrid+ CBD80 locomotives for Sellafield. A further order has been agreed Beacon Rail Leasing for the supply of 15 more CBD90 locomotives along with options for a period of three years.
Each electric loco weighs 90 tonnes and is capable of pulling (or pushing) loads up to 2,500 tonnes.
Further orders have since been gained from Tata Steel and also for two Hybrid+ CBD80 locomotives for Sellafield. A further order has been agreed Beacon Rail Leasing for the supply of 15 more CBD90 locomotives along with options for a period of three years.
Each electric loco weighs 90 tonnes and is capable of pulling (or pushing) loads up to 2,500 tonnes.
Frans Schols, SV1XV have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2024
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.