Summit Energy

Summit Energy

Posted on 03/29/2013


Photo taken on March  9, 2013



Keywords

powerline
utility pole
distribution line
JMEC


Authorizations, license

Visible by: Everyone
All rights reserved

54 visits

old 50s/60s JMEC 3 phase 12 kv

old 50s/60s JMEC 3 phase 12 kv
Fibre for 4G LTE cell tower was recently installed.

Comments