Substation 32​​

1808 – 114 Avenue SE​​

Purpose:

The Alberta Electric System Operator and ENMAX Power Corporation are proposing transformer capacity upgrades at No. 32 Substation. These upgrades are required to satisfy the need of the load growth in southeast Calgary.

This Project Involves

Installation of a new 50 MVA, 115-13.8 kV transformer
One 115 kV bus tie circuit breaker
One set of 3-phase potential transformers
A new lineup of 15 kV switchgear at the No. 32 substation, and
Movement of existing equipment within the yard to accommodate additional infrastructure​.