The Picture Butte Sub is like a connection point for 240kV class lines. The Langdon-Lethbridge line stops their and so does the Great Falls, MT-Picture Butte line end there. Altalink is thinking of adding another 240kV line! it will run 70 miles East into the Medicine Hat area.